Renovations In Progress
After 27 years, the Kindig Performing Arts Center gets a facelift.
Click on any picture to see a larger image.
Loading...
Loading...
Loading...
The spec book Lobby plans side section - yes, those are chandeliers. The drawing for the seating area.
Loading...
Loading...
Loading...
Two of the demolition dudes carting off the old chairs. Main floor center section - all that yellow stuff is from the seat cushions that were disintegrating. Main floor, house left. Rather amusing that just the seats from the front row are left.
Loading...
Loading...
Loading...
The empty center section as seen from the stage. Ooops - where'd the carpetting go? House left as seen from the stage.
Loading...
Loading...
Loading...
The stage floor has been sanded in preparation for the new stain. The hall from the lobby to the music department gets its carpet ripped out. The lobby with no carpet.
Loading...
Loading...
Loading...
The demolition dudes hard at work ripping out the ceiling of the lobby. Ah there's nothing like a good reciprocal saw to get the job done. Even the underhang gets ripped out. The blue beam is a support beam, so that has to stay (petty details).
Loading...
Loading...
Loading...
Above the door leading into the hallway to the music department - just a wee bit of dust. The frame work for the new ceiling slowly but surely appears. Several days later, the drywall for the framework goes up and installation of the light fixtures begins.