The spec book
|
Lobby plans side section - yes, those are chandeliers.
|
The drawing for the seating area.
|

|

|

|
|
Two of the demolition dudes carting off the old chairs.
|
Main floor center section - all that yellow stuff is from the seat cushions that were disintegrating.
|
Main floor, house left. Rather amusing that just the seats from the front row are left.
|

|

|

|
|
The empty center section as seen from the stage.
|
Ooops - where'd the carpetting go?
|
House left as seen from the stage.
|

|

|

|
|
The stage floor has been sanded in preparation for the new stain.
|
The hall from the lobby to the music department gets its carpet ripped out.
|
The lobby with no carpet.
|

|

|

|
|
The demolition dudes hard at work ripping out the ceiling of the lobby.
|
Ah there's nothing like a good reciprocal saw to get the job done.
|
Even the underhang gets ripped out. The blue beam is a support beam, so that has to stay (petty details).
|

|

|

|
|
Above the door leading into the hallway to the music department - just a wee bit of dust.
|
The frame work for the new ceiling slowly but surely appears.
|
Several days later, the drywall for the framework goes up and installation of the light fixtures begins.
|